Digital Media
Use Channel to Preset Mapping for GAM
If set to No, when creating a line item in GAM the system will check for placement relationships to GAM to find the creative sizes. If set to Yes, the system will check if there is a channel for the item, and if so, will create the line item in GAM with expected creatives based on the related preset.
Populate Reserved Product Scheduler on Page Load
By default, this configuration is set to Yes, meaning the Reserved Product Scheduler will automatically load all calendar and runsheet data when you navigate to the page. If you change the configuration to No, you’ll either need to filter the results, or click to view all before the data is displayed. If you have a large data set of Reserved items, we recommend setting this configuration to No, and filtering your results before viewing the data, as this will improve the scheduler loading time.
Updated 10/18/2024